NFPA 241 · For owners & general contractors

Construction fire safety plans, prepared and seen through their approval.

We write your NFPA 241 or IFC Chapter 33 plan, submit it to your fire department, and handle their comments until it's approved.

MA · NH · RI · CT · ME · VT · NY · FIXED FEE

Tower crane over a podium deck, with wood-frame walls going up and lumber staged across the slab
On site · Wood-frame over podium

01 — Who prepares your plan

Reviewed by someone who’s sat on the other side of the counter

Erik C. Wight

Erik C. Wight

CBO · LEED GA · FPPM

Principal Code Consultant

Licenses

  • Building Official

    Massachusetts · BO-1008

  • Building Official

    Connecticut · 21519

  • Third-Party Inspector

    Maine · 237

Erik has spent more than 35 years in construction as a builder, building commissioner, code consultant, and plans examiner. He has done thousands of plan reviews and inspections, from restaurants and assisted living to hospitals, podium buildings, casinos, and high-rises, across building, accessibility, mechanical, plumbing, and fire protection. He knows what a plan reviewer looks for because he's been the plan reviewer.

  1. 2001–2024

    Owner, Keystone Code, LLC

    Code consulting, plan review, and owner’s representation on large residential and commercial projects. Seminars for building officials, designers, and contractors.

  2. 2001–2024

    Plan Examiner, Kelly P. Reynolds & Associates

    Reviewed commercial and industrial plans for local AHJs across the U.S.

  3. 2018–2019

    Senior Project Manager, 4LEAF

    Senior plan review and inspection, including Encore Boston Harbor.

  4. 2013–2018

    Building Commissioner, Town of Agawam, MA

    Enforced the Massachusetts State Building Code and ran the Inspection Services Department.

  5. 2000–2013

    Building Commissioner, Town of Sunderland, MA

    Plan review, inspections, and permitting.

  6. 1997–2000

    Building Inspector, Town of Bedford, MA

    Inspections, plan review, and permitting.

Certifications

  • Building Official (ICC)
  • Building Plans Examiner (ICC)
  • Commercial Building Inspector (ICC)
  • Fire Inspector I & II (ICC)
  • Accessibility Inspector / Plans Examiner (ICC)
  • Commercial Mechanical Inspector (ICC)
  • Fire Prevention Program Manager (NFPA)
  • Plumbing Inspector & Plans Examiner (ICC)
  • Residential Combination Inspector (ICC)
  • LEED Green Associate
  • OSHA 10

02 — Services

Everything it takes to get your plan approved

We prepare the plan, submit it, and stay with it until your Authority Having Jurisdiction signs off.

Construction fire safety plan

A complete fire safety plan for your site, NFPA 241 or IFC Chapter 33, written to your fire department’s requirements.

Fire department submission

We file the plan with your Authority Having Jurisdiction and handle the follow-up, so your team can stay on the job.

Comments and revisions

When the fire department comes back with comments, we respond and resubmit until the plan is approved.

Every plan covers

FP-001

Site Access & Fire Routes

Fire department access roads, gate locations, and staging areas

FP-002

Water Supply

Hydrant locations, standpipe connections, and flow rate documentation

FP-003

Fire Protection Systems

Sprinkler, alarm, standpipe, and detection system status tracking

FP-004

Hot Work Program

Permit procedures, designated areas, and fire watch requirements

FP-005

Combustible Management

Storage locations, waste removal schedules, and heating equipment

FP-006

Emergency Procedures

Evacuation routes, assembly points, and emergency contact chains

FP-007

Inspection Schedules

Daily and weekly inspection checklists

FP-008

Responsible Parties

Fire prevention manager, safety director, and contractor assignments

In the field

Emergency egress plan taped below a Stair 3 Ground Level sign on a concrete column

FP-006 · Emergency Procedures

Egress plans posted at every stair, so crews know the way out on every level.

Wood-frame corridor with temporary sprinkler piping overhead and a fire extinguisher station

FP-003 · Fire Protection Systems

Sprinkler piping and extinguishers in place as the building closes in.

Standpipe riser with a hose valve and control valve in a wood-frame stair shaft at Stair 3, Level 3

FP-002 · Water Supply

Standpipe risers extended as each floor goes up, with a hose valve ready at every stair landing.

03 — How it works

Send one message. We handle the rest.

  1. 01

    Tell us about your project

    Send a message with the project location, building type, and timeline. We’ll reply by email with a fixed-fee quote and next steps.

  2. 02

    We prepare your plan

    We review your project against your state’s fire code and your fire department’s requirements and write the plan. You’ll get an email when it’s ready.

  3. 03

    We submit it

    We file the plan directly with your fire department and handle their comments until it’s approved.

04 — Service area

New England and New York

We prepare and submit plans for projects in seven states.

  • MAMassachusettsNFPA 241
  • NHNew HampshireNFPA 241
  • RIRhode IslandNFPA 241
  • CTConnecticutNFPA 241
  • MEMaineNFPA 241
  • VTVermontNFPA 241
  • NYNew YorkIFC Chapter 33
  • NYCNew York CityNYC FC Chapter 33

Project somewhere else? Email us and we'll let you know.

CTMEMANHNYVTRI

05 — Pricing

A fixed fee, not an hourly bill.

We quote a fixed fee up front, before any work starts. No hourly billing and no surprise invoices.

Every plan includes

  • Plan prepared under a certified building official
  • Submission to your fire department
  • Responses to fire department comments
  • Revisions until approved
  • Email updates at every stage
Contact us

06 — Questions

Common questions

What is an NFPA 241 fire safety plan?
NFPA 241 is the standard for safeguarding construction, alteration, and demolition operations. It requires a written fire safety plan covering site access, water supply, fire protection systems, hot work, combustible management, emergency procedures, inspection schedules, and responsible parties.
What about New York?
New York follows IFC Chapter 33 instead of NFPA 241, and New York City has its own Fire Code Chapter 33. The plans cover the same ground: site access, water supply, hot work, and emergency procedures. We write to whichever code your project falls under.
Which states do you work in?
We prepare and submit plans for projects in Massachusetts, New Hampshire, Rhode Island, Connecticut, Maine, Vermont, and New York.
How is pricing set?
Each plan is a fixed fee — no hourly billing. We quote a fixed fee up front, before any work starts.
Do you deal with the fire department?
Yes. We submit the plan directly to your fire department and respond to their comments until the plan is approved.

Get your fire safety plan prepared and approved.

Tell us about your project. We'll take it from there — preparation, submission, and revisions until it's approved.

Contact us